Boaters generally start from Rose Point (US 422 bridge) outside of the park boundary and finish at Eckert Bridge, covering 2.5 miles with a mandatory portage around the dam at the historic gristmill. From the Eckert Bridge, boaters can extend their trip an additional 3.5 miles to the Harris Bridge. The total trip from Rose Point to Harris Bridge is approximately 6 miles.